Insurance Deadlines

# Fuse Box to Breaker Panel Replacement in Toronto and the GTA

Fuse box replacement in Toronto converts an outdated 60A fuse panel or Edison-base cartridge fuse box to a modern 100A or 200A breaker panel with arc-fault circuit interrupters (AFCI) and ground-fault circuit interrupters (GFCI) where required by the Ontario Electrical Safety Code, plus a whole-home surge protective device (SPD), a copper grounding electrode conductor, an updated neutral bar bonding jumper, and an ESA Certificate of Acceptance your insurer will accept for policy renewal. 

Toronto Electrical Panel Upgrade

[/ →](/)

 handles the Toronto Hydro service disconnect and reconnect, files the ESA permit, and delivers the inspection certificate on the day of energization. A fuse box to breaker panel conversion in Toronto costs $1,800 to $5,000 CAD depending on panel size (24 to 42 circuits), whether the existing service entrance conductors are reusable or need replacement, and which load centre you choose from Siemens, Schneider Electric Homeline, or Eaton BR series.

Most calls start with a trigger: a home insurance non-renewal notice, a real-estate closing condition, a home inspection report flagging the fuse box, a Federal Pacific Stab-Lok or Zinsco panel discovered in the basement, or a Notification of Work required for adjacent renovation. We serve Toronto, Etobicoke, Scarborough, North York, York and East York on Toronto Hydro, plus Mississauga, Brampton, Vaughan and Markham on Alectra Utilities, Oakville on Oakville Hydro, Burlington on Burlington Hydro, and Ajax, Pickering, Whitby on Elexicon Energy inside our 50km radius.

-   ECRA/ESA Licensed
-   ESA Permit Included
-   Utility Coordination Handled
-   Written Itemised Quote

Get a Free On-Site Estimate

[/free-estimate/ →](/free-estimate/)

 

+1-647-577-6113

[tel:+16475776113 →](tel:+16475776113)

Written itemised quote

$ 1,800 to $5,000 CAD

-   ESA permit filed and inspection booked
-   Utility disconnect and reconnect coordinated
-   Same-Week Scheduling

View Pricing Detail

[#pricing →](#pricing)

-   ECRA/ESA Licensed
-   ESA Permit Included on Every Job
-   Same-Week Scheduling
-   WSIB Certified
-   Free Written Itemised Quote

## What Is Fuse Box Replacement?

Fuse box replacement swaps an Edison-base or cartridge fuse block for a modern breaker panel with arc-fault and ground-fault protection. The old fuse block comes out entirely, a new load centre goes in, every branch circuit is transferred onto a correctly sized breaker, the neutral bar is bonded properly, and the grounding electrode conductor is verified back to the water service or ground rod.

In Toronto the call almost always arrives with a deadline attached. An insurance renewal notice, a non-renewal letter, or a home inspection report ahead of closing puts a date on it. The document that resolves all three is the same: the ESA Certificate of Inspection, which confirms an inspector reviewed the work against the Ontario Electrical Safety Code (OESC).

Most fuse panels in the city sit on a 60A service, which is the second half of the conversation. A breaker panel on a 60A service is legal and insurable, but 60A does not carry a modern household. Since the utility has to attend anyway when the service size changes, the incremental cost of going to 100A or straight to 200A at the same time is far lower than treating it as a second project later. We quote both so the decision is yours.

Typical fuse-box-to-breaker jobs finish in 1 day. For the broader range of residential work, see 

residential electrical panel upgrades

[/residential-electrical-panel-upgrades/ →](/residential-electrical-panel-upgrades/)

.

### Types of Fuse Installation We Replace

-   **Edison-base screw-in fuses.** The familiar glass plug fuses. Easy to over-fuse, which is exactly why underwriters dislike them.
-   **Cartridge pull-out blocks.** Usually the main and the range circuit. Common on 60A services in 1920s to 1950s Toronto homes.
-   **Split-bus fuse and breaker hybrids.** A later breaker panel with a fuse-protected section still live. These get replaced as a whole, not patched.
-   **Sub-fused additions.** A fuse block feeding a later addition or garage. The feeder is re-terminated into the new panel or converted to a proper subpanel.

## When You Need a Fuse Box Replaced

-   **The insurer has written to you.** A renewal condition or non-renewal notice naming the fuse panel. See 
    
    insurance-required electrical upgrades
    
    [/insurance-required-electrical-upgrades/ →](/insurance-required-electrical-upgrades/)
    
     for the documentation path.
-   **A home inspection flagged it before closing.** Buyers’ lawyers routinely make the certificate a closing condition.
-   **Fuses blow repeatedly.** A fuse that keeps going is telling you the circuit is loaded past its conductor rating, and replacing it with a larger fuse makes it more dangerous, not less.
-   **You are renovating.** Any renovation that puts new circuits in front of an ESA inspector generally ends with the fuse block being replaced anyway.
-   **You are adding modern loads.** A charger, heat pump or induction range on a 60A fuse service is not a capacity question, it is a service upgrade question. See 
    
    60A to 100A service upgrades
    
    [/60a-to-100a-service-upgrades/ →](/60a-to-100a-service-upgrades/)
    
    .
-   **The panel is warm or smells hot.** Stop using it and call. Heat at a fuse block means loose or corroded contacts carrying load.

## What Drives the Cost Between $1,800 and $5,000

**Service size** is the main lever. A conversion at the same amperage with no utility disconnect is the cheapest version. **Service entrance condition** is next: a corroded meter base, an aged mast and weatherhead, or undersized conductors push the scope up. **Panel position** matters because the code requires working space, so a fuse block in a closet or under a stair means the new load centre relocates and the feeder is rerouted. **Branch-circuit condition** is the fourth: deteriorated cloth insulation or aluminum terminations at the panel need remediation before the inspector signs.

The ESA permit fee is included in the quote. Where the service size changes and the utility has to disconnect, that coordination fee appears on its own line rather than being folded into labour.

## What to Expect on Conversion Day

If the service size is unchanged, there is no utility visit: we isolate at the main, remove the fuse block, mount the new breaker panel, and transfer circuits. If the service is being upgraded at the same time, the utility pulls the meter first and the outage covers most of the working day.

Circuits move across onto breakers matched to the conductor size, with arc-fault and ground-fault protection fitted where the Ontario Electrical Safety Code requires it. A whole-home surge protective device goes in at this point if you have opted for one. The neutral bar is bonded, the grounding electrode conductor is verified or replaced, terminations are torqued, and the panel schedule is written and fixed inside the door.

The ESA inspector attends, and once the Certificate of Inspection is signed you have the document your insurer or lawyer is waiting for. We hand it over with the itemised invoice.

## Signs Your Fuse Box Needs Replacing: Blown Fuses, Scorched Blocks, Overfused Circuits, Insurance Refusal

A Toronto fuse box tells you it is failing in one of five ways. Homeowners often live with the symptoms for years before an inspection or an insurance letter forces the conversion.

### Visible signs at the fuse box

-   **Scorched or blackened fuse block:** brown or black staining around a plug fuse socket means the terminal has arced. On a 60A Cutler-Hammer or 1950s Sylvania fuse box, this is a fire hazard, not a cosmetic issue.
-   **Multiple blown or replaced fuses:** if the fuse drawer holds 15A, 20A, 25A and 30A Edison plugs in a rotating cycle, someone has been sizing up to stop nuisance blows. That is overfusing, and it is unsafe.
-   **Bypassed or “penny-behind-the-fuse” wiring:** any coin, foil or wire bridging a fuse holder is an immediate ESA concern and voids insurance coverage on the spot.
-   **Warm feeder cable at the meter base:** if the cable feeding a 60A fuse panel feels warm under load, terminations are loose or the conductors are undersized.

### Symptoms during normal use

-   **Fuses blow when the range and dryer run together:** the 60A service simply cannot carry both continuous loads plus lighting and refrigeration.
-   **The lights dim when the fridge or furnace kicks in:** voltage drop on a 60A service under motor start is measurable and consistent.
-   **A recent home inspection flagged the fuse panel:** the report will name a 60A Federal Pioneer, Cutler-Hammer or Sylvania fuse box as a listed deficiency.

### The paperwork trigger

-   **Insurer letter naming the panel:** the underwriter names the fuse box specifically, gives you 30-60 days, and threatens non-renewal or a hard cancellation.
-   **Mortgage lender condition on closing:** the lawyer holds funds until the ESA Certificate of Inspection lands on their desk.

## Why Insurers Reject 60A Fuse Panels in Ontario: Fire Loss Data, Overfusing Risk, and Underwriting Rules

Ontario insurers have a specific list of panels they will not bind coverage on, and 60A fuse boxes are at the top. The reason is claims data, not preference.

### The insurer’s technical objections

-   **Continuous-load capacity of 60A is not enough for modern homes:** a fridge, a range, a dryer, a furnace fan and general lighting alone push a 60A service past 80% continuous load before any EV or heat pump enters the picture.
-   **Overfusing is invisible from the outside:** an insurer inspecting from the meter cannot tell whether a 30A Edison plug is sitting in a 15A circuit. Removing the panel from the risk pool is easier than auditing every home.
-   **No arc-fault or ground-fault protection is possible on Edison plug fuses:** the 2018 and later Ontario Electrical Safety Code cycles require AFCI and GFCI on defined circuits, and a fuse block cannot host them.

### Which insurers apply the rule

-   **Every Ontario personal-lines carrier:** Intact, Aviva, Economical, Wawanesa, Allstate, Belairdirect, Desjardins, TD Insurance, RSA, and CAA all apply a 60A fuse panel exclusion or non-renewal.
-   **Broker-placed HomeShield and secondary markets:** may bind coverage at a higher premium with a documented replacement plan on file.
-   **New policy vs renewal:** a renewal usually gets a 30-90 day cure window. A new policy is bound only after the ESA Certificate arrives.

### What satisfies the underwriter

-   **ESA Certificate of Inspection naming the new breaker panel:** the document names the address, the service size (100A or 200A), and the panel brand.
-   **A permanent 100A or 200A breaker service in a Siemens, Square D or Eaton load centre:** temporary subpanels or interim wiring do not close the file.

## What Fuse Box to Breaker Conversion Involves: Panel Swap, Circuit Transfer, Grounding, ESA Sign-Off

A conversion is not a like-for-like swap. Fuse boxes and breaker panels differ in circuit topology, grounding and neutral separation, and the Ontario Electrical Safety Code has changed since the fuse box was installed.

### The physical work at conversion

-   **Old fuse block removal:** the Edison plug fuse holders, cartridge fuse blocks, and the fibre or bakelite backing plate come out. The service entrance conductors are landed temporarily to allow reuse or replacement.
-   **New load centre installation:** a Siemens PL, Square D QO or Eaton BR 100A or 200A breaker panel gets mounted on the same wall or a compliant new position with defined working space per OESC Section 2.
-   **Grounding electrode conductor verification:** the water-pipe bond and the ground rod at the meter base are tested and, if undersized or missing, replaced with a 6 AWG or 4 AWG copper GEC.
-   **Bonding jumper and neutral bar separation:** in a main panel the neutral and ground bond together; in any subpanel installed downstream, they separate. Fuse boxes often had this wrong.

### Circuit-level work during conversion

-   **Every existing branch circuit re-terminated on a correctly sized breaker:** 15A on 14 AWG copper, 20A on 12 AWG copper, 30A on 10 AWG copper, sized by conductor rather than by the old fuse.
-   **Knob-and-tube or aluminum branch circuits identified and flagged:** the conversion does not automatically remediate legacy wiring, and any K&T or aluminum branch circuit gets a written recommendation for follow-up.
-   **AFCI and GFCI protection added on required circuits:** bedrooms, living areas, kitchen counter, bathrooms, and outdoor circuits.

### The paperwork chain

-   **ESA Notification of Work filed before the panel comes out:** typical turn-around 24 to 48 hours.
-   **ESA inspection on completion, Certificate of Inspection issued:** this is the document your insurer, lawyer or lender accepts as proof of compliance.

## How Much Does Fuse Box Replacement Cost in Toronto?

A fuse box to breaker panel conversion runs $1,800 to $5,000 CAD. The ESA permit fee is included, and the utility coordination fee is itemised separately when the service size changes.

Typical range

$ 1,800 to $5,000

per conversion (CAD)

-   ESA permit fee included
-   Final ESA inspection included
-   Utility coordination itemised, never hidden

Get an Itemised Quote

[/free-estimate/ →](/free-estimate/)

### What Moves the Price

#### Overhead mast or underground lateral

An underground service entrance needs trenching and civil work, so it sits higher in the range than a mast and weatherhead replacement.

#### Panel brand and circuit count

Siemens, Square D / Schneider Electric and Eaton load centres price differently, and a 42-circuit panel costs more than a small enclosure.

#### Service entrance length and routing

Conductor length from the meter base to the panel, plus any wall penetration or conduit work, changes the material and labour line.

#### Scope flagged by the load calculation

An OESC Section 8 result can add a subpanel, a grounding electrode conductor or a meter base that was not in the original plan.

| Scope | Low | High |
| --- | --- | --- |
| Fuse block to breaker panel, same service size | $ 1,800 | $ 3,200 |
| Conversion with new meter base and conductors | $ 2,800 | $ 4,200 |
| Conversion combined with a 100A or 200A service upgrade | $ 3,500 | $ 5,000 |

## Why Choose Us for Fuse Box Replacement?

ECRA/ESA licensed, permit filed, utility coordinated, quote itemised.

-   ### 20+ Years of Panel Upgrade Experience
    
    Over two decades of ECRA/ESA-licensed panel replacement, service entrance upgrades, fuse box conversions and utility coordination across Toronto and the GTA. Panel work is the whole business, not a side service.
    
-   ### Built around insurance deadlines
    
    Most fuse box calls come with a renewal or closing date attached. Tell us the deadline and we schedule backward from it.
    
-   ### One-day conversions where possible
    
    A straight fuse block to breaker conversion at the same service size is typically a 1 day job, so you are not without power across a weekend.
    
-   ### Grounding and bonding corrected
    
    Old fuse installations often have a grounding electrode conductor that no longer complies. We correct it rather than leave it for the inspector to flag.
    
-   ### Honest 100A versus 200A advice
    
    If you are paying for the utility disconnect anyway, we show you what the 200A option costs before you decide on 100A.
    

## How Does Fuse Box Replacement Work?

The sequence every job follows, from the first load calculation to the utility reconnect.

1.  01
    
    ### Read the existing service
    
    Fuse block type, service size, cloth or aluminum branch wiring, meter base condition, and whether the insurer has set a deadline.
    
2.  02
    
    ### Decide the service size
    
    Most fuse panels sit on a 60A service. We calculate whether 100A is enough or 200A is the better value given the utility work is the same.
    
3.  03
    
    ### Permit and utility booking
    
    ESA Notification of Work filed. Where the service size changes, the utility disconnect is booked at the same time.
    
4.  04
    
    ### Conversion day
    
    Fuse block removed, breaker panel mounted, circuits transferred with AFCI and GFCI protection where required, neutral bonded, grounding verified.
    
5.  05
    
    ### Inspection and certificate
    
    ESA inspection, then the Certificate of Inspection goes straight to you so your broker can close the file.
    

## How Toronto Electrical Panel Upgrade Compares

| Feature | Typical provider | Toronto Electrical Panel Upgrade |
| --- | --- | --- |
| ESA Certificate of Inspection | Extra cost or not offered | Included on every conversion |
| AFCI and GFCI protection | Standard breakers only | Fitted where the code requires it |
| Grounding electrode conductor | Left as found | Verified and corrected |
| Insurance documentation | Invoice only | Certificate plus written scope for underwriting |

## Need Fuse Box Replacement in Toronto or the GTA?

Free on-site estimate, written itemised quote, ESA permit filed before the work starts.

+1-647-577-6113

[tel:+16475776113 →](tel:+16475776113)

 

Free On-Site Estimate

[/free-estimate/ →](/free-estimate/)

## Our Fuse Box Replacement Work

Documentary photos from panel jobs across Toronto and the GTA. Select any image to enlarge it.

    

## What Customers Say About Our Fuse Box Replacement Work

Real Toronto and GTA neighbourhoods, real panel jobs.

> Our broker would not renew with screw-in fuses in the basement. The conversion was done in a day and the ESA certificate went to underwriting the same week.

Hannah W.Cabbagetown

> They found the ground clamp on the water service had been cut during a plumbing repair years ago. Fixed it as part of the job and explained why it mattered.

Emeka O.Little Italy

> We were quoted for 100A by someone else. This crew showed us the 200A price with the same utility visit and it was barely different, so we took it.

Yulia P.Parkdale

## Fuse Box Replacement FAQs

### How much does fuse box replacement cost in Toronto?

A fuse box to breaker panel conversion runs $1,800 to $5,000 CAD. A straight swap at the same service size, with the panel staying in position, sits at the low end. A new meter base, replacement service entrance conductors, a panel relocation for working-space clearance, or a conversion combined with a 100A or 200A service upgrade moves it up. The ESA permit fee is included in every quote.

### How long does a fuse box conversion take?

Typically 1 day where the service size stays the same and the panel stays in position. It becomes a 2 day job when the mast, meter base and service entrance conductors are replaced too, or when the conversion is combined with a service upgrade that needs a utility disconnect window.

### Why do insurers care about fuse boxes?

Fuse blocks cannot provide arc-fault or ground-fault protection, they invite over-fusing (a 30A fuse in a 15A circuit), and the installations are old enough that the branch wiring and grounding are often non-compliant as well. Underwriters treat that as elevated fire risk, so many Toronto insurers decline, surcharge or set a replacement deadline. The ESA Certificate of Inspection is what closes the file.

### Do I have to upgrade the service at the same time?

Not always. If the existing service size still suits your loads, we convert the fuse block to a breaker panel at the same amperage. But most fuse panels sit on a 60A service, and once the utility is coming out anyway, going to 100A or 200A costs far less as one project than as two. We show you both numbers.

### What is AFCI and GFCI protection?

An arc-fault circuit interrupter detects the low-current arcing that starts fires in damaged or loose wiring. A ground-fault circuit interrupter cuts power when current leaks to ground, which is the protection required around water. The Ontario Electrical Safety Code requires these on defined circuits, and a fuse block cannot provide either. We fit them where the code requires.

### Will my old wiring pass inspection?

The panel conversion is inspected, and the ESA inspector will look at the terminations and the condition of the branch circuits entering the panel. Cloth-insulated or aluminum branch wiring is not automatically a failure, but deteriorated insulation at the terminations has to be remediated. We flag anything visible at the estimate so it is in the quote, not a surprise.

### Can you add surge protection during the conversion?

Yes. A whole-home surge protective device mounts in the new panel and is the cheapest time to add it, because the enclosure is already open and a two-pole position is available. It protects against transients from the grid and nearby lightning, which older fuse installations had no protection against at all.

### What happens to my existing circuits?

Each circuit is transferred onto a correctly sized breaker in the new panel, with arc-fault or ground-fault protection where the code requires it. Over-fused circuits get the breaker the conductor size actually supports, which occasionally reveals a circuit that was carrying more than it should. The panel schedule is written and fixed inside the door.

### Do you replace Federal Pioneer or Stab-Lok panels too?

Yes, though that is a different job. A Federal Pacific Stab-Lok or Federal Pioneer panel is a breaker panel with a documented failure-to-trip defect rather than a fuse block. See \[Federal Pacific Stab-Lok panel replacement\](/federal-pacific-stab-lok-panel-replacement/) for that scope.

### Is the certificate enough for a real estate closing?

The ESA Certificate of Inspection is the document lawyers and buyers' agents ask for as proof the panel work was permitted and inspected. If you are closing on a date, tell us and we will confirm whether the inspection can land in time before you commit.

### Still have a question?

Ask the crew directly. We answer load calculation, permit and utility coordination questions before you commit to anything.

Send a Message

[/contact/ →](/contact/)

 

Book a Free Estimate

[/free-estimate/ →](/free-estimate/)

## Related Services

### Insurance-Required Electrical Upgrades

Insurance-required electrical upgrades in Toronto resolve insurer-mandated panel replacements fast with an ESA Certificate of Acceptance and Notification of Work documentation that Ontario home insurers (Aviva, Intact, Wawanesa, Economical, Desjardins, Sonnet, TD Insurance) accept before renewal, mid-term inspection, or real-estate closing. Toronto Electrical Panel Upgrade handles the ESA permit filing, Toronto Hydro service disconnect and reconnect coordination, and delivers a stamped Certificate directly to your underwriter within one business day of energization. An insurance-required upgrade in Toronto costs $2,500 to $8,000 CAD depending on whether you need a 60A fuse panel replaced with a 100A or 200A breaker panel, a Federal Pacific Stab-Lok removal, or aluminum wiring termination remediation, with the ESA permit fee itemised. Most calls start with a trigger: a home insurance non-renewal notice, an insurance surcharge for a 60A fuse panel flag, a home inspection report identifying Federal Pacific Stab-Lok or aluminum branch wiring, a closing condition on a real-estate transaction, or an underwriting review requiring the Notification of Work document. We serve Toronto, Etobicoke, Scarborough, North York, York and East York on Toronto Hydro, plus Mississauga, Brampton, Vaughan and Markham on Alectra Utilities, Oakville on Oakville Hydro, Burlington on Burlington Hydro, and Ajax, Pickering, Whitby on Elexicon Energy inside our 50km radius.

View service

[Insurance-Required Electrical Upgrades →](/insurance-required-electrical-upgrades/)

### Federal Pacific Stab-Lok Panel Replacement

Federal Pacific Stab-Lok panel replacement in Toronto removes a defective Federal Pacific Electric, Federal Pioneer, or Zinsco Stab-Lok panel identified at home inspection or flagged during closing, and installs a code-compliant 100A or 200A breaker panel with proper arc-fault protection, a whole-home surge protective device, an ESA Certificate of Acceptance, and documentation your home insurer will accept to lift a non-renewal notice. The Stab-Lok failure-to-trip defect is a documented resale closing condition across the GTA. Toronto Electrical Panel Upgrade handles the Toronto Hydro service disconnect and reconnect, files the ESA permit, replaces the load centre and any corroded grounding electrode conductor, and delivers the inspection certificate for insurer submission. A Federal Pioneer panel replacement in Toronto costs $2,500 to $6,000 CAD depending on service size (100A vs 200A), whether the meter base and service mast are reusable, and which load centre you choose from Siemens, Square D QO series, Schneider Electric Homeline, or Eaton BR series. Most calls start with a trigger: a home inspection flag identifying breaker colour markings characteristic of Stab-Lok, a real-estate closing condition, a Zinsco or Pushmatic panel discovered during renovation, a home insurance underwriting requirement, or a Notification of Work required for basement finish. We serve Toronto, Etobicoke, Scarborough, North York, York and East York on Toronto Hydro, plus Mississauga, Brampton, Vaughan and Markham on Alectra Utilities, Oakville on Oakville Hydro, and Ajax, Pickering, Whitby on Elexicon Energy inside our 50km radius.

View service

[Federal Pacific Stab-Lok Panel Replacement →](/federal-pacific-stab-lok-panel-replacement/)

### 60A to 100A Service Upgrades

60A to 100A service upgrades in Toronto move an original pre-1965 60A fused service to a modern 100A breaker panel (or straight to 200A if OESC Section 8 demand load calculation supports it) with new #2 AWG copper or #1/0 AWG aluminum service entrance conductors, a new 100A main service disconnect breaker, updated meter base, weatherhead, service mast where required, proper grounding electrode conductor and bonding jumper, and an ESA Certificate of Acceptance. Toronto Electrical Panel Upgrade handles the Toronto Hydro service disconnect and reconnect coordination, files the ESA permit, and delivers same-day energization on most residential jobs. A 60A to 100A service upgrade in Toronto costs $2,000 to $4,500 CAD depending on overhead vs underground service entrance, whether the mast and meter base need replacement, and which load centre you choose from Siemens, Square D or Eaton, with the ESA permit fee itemised. Most calls start with a trigger: a home insurance non-renewal notice, a real-estate closing condition on a Cabbagetown or Riverdale character home, an original knob-and-tube era 60A service flagged during home inspection, or an Edison-base fuse panel that cannot support modern loads. We serve Toronto, Etobicoke, Scarborough, North York, York and East York on Toronto Hydro, plus Mississauga, Brampton, Vaughan and Markham on Alectra Utilities, Oakville on Oakville Hydro, and Ajax, Pickering, Whitby on Elexicon Energy inside our 50km radius.

View service

[60A to 100A Service Upgrades →](/60a-to-100a-service-upgrades/)

![](/images/hero/two-electricians-in-plain-workwear-seen-from-behin.webp)

Same-Week Scheduling

## Book Your Fuse Box Replacement Estimate

Free on-site assessment across Toronto and the GTA. Written itemised quote before any work begins, with the ESA permit fee and utility coordination fee separated on the line.

Get a Free On-Site Estimate

[/free-estimate/ →](/free-estimate/)

 

+1-647-577-6113

[tel:+16475776113 →](tel:+16475776113)

-   ESA permit and final inspection included
-   Toronto Hydro coordination handled
-   No hidden fees on the written quote

## Thanks, we have your request.

A licensed crew member will be in touch to book the on-site estimate.

## Request a Written Itemised Quote

Four fields. We reply with a free on-site estimate date and the ESA permit and coordination fees broken out separately.