Skip to main content
Electrical panel upgrade crew working in a Greater Toronto Area property
Serving Burlington and surrounding areas

Electrical Panel Upgrades in Burlington: 100A to 200A Service

Burlington 100A to 200A service upgrades and panel replacements, with Burlington Hydro coordinating the disconnect and reconnect.

  • Burlington Hydro coordination included
  • Same-Week Scheduling
  • ESA permit and inspection included
Neighbourhoods we cover
  • Aldershot
  • Roseland
  • Alton Village
  • ECRA/ESA Licensed
  • ESA Permit Included on Every Job
  • Same-Week Scheduling
  • WSIB Certified
  • Free Written Itemised Quote

When Do You Need an Electrical Panel Upgrade in Burlington?

Eight triggers account for almost every panel upgrade we quote in Burlington. If one of these describes your property, the load calculation will tell you how far the existing service can stretch.

01

Home insurance refusal or a renewal notice

Toronto underwriters decline or surcharge policies on homes still running an obsolete 60A service or a fuse block. The ESA Certificate of Inspection is what closes the file.

02

Level 2 EV charger installation at 40A or 50A

An EV charger is a continuous load. Added to laundry, HVAC and refrigeration on an aged 100A panel, the OESC Section 8 calculation runs out of room fast.

03

Heat pump or central air conversion

Moving off gas heating to a cold-climate heat pump needs dedicated high-amperage breakers and headroom the original panel was never sized for.

04

Legal basement suite or accessory dwelling unit

City of Toronto secondary-suite permits require a documented load calculation, a dedicated subpanel and a separate disconnect for the suite.

05

Screw-in glass fuses or cartridge fuse blocks

Fuse blocks cannot provide the arc-fault and ground-fault protection the Ontario Electrical Safety Code now expects on modern branch circuits.

06

Flickering lights when appliances start

That flicker is voltage drop under load. It points at bus-bar saturation or loose terminations at the main breaker, both end-of-life signals.

07

Doubled-up breakers with no knockouts left

When every position is tandemmed and the enclosure has no knockouts left, adding a circuit safely means a new load centre, not more stacking.

08

Corroded service mast or meter base

A weathered mast and weatherhead lets water track into the panel interior. The service entrance conductors and meter base get replaced with the panel.

Panel Upgrade Services in Burlington

Burlington 100A to 200A service upgrades and panel replacements, with Burlington Hydro coordinating the disconnect and reconnect.

Burlington Hydro handles the disconnect and reconnect for Burlington addresses. We file the ESA Notification of Work, book the utility window, complete the install, and hand over the Certificate of Inspection.

Crew installing a 200A main breaker and 42-circuit load centre in a Toronto basement Most Requested

100A to 200A Service Upgrades

A 100A to 200A service upgrade in Toronto is Toronto Electrical Panel Upgrade's most-requested job. Upgrade from an undersized 100A service to a full 200A, 42-circuit panel with 2/0 AWG copper or 4/0 AWG aluminum service entrance conductors sized per OESC Section 8, a new meter base, weatherhead and mast where required, whole-home surge protector, copper grounding electrode conductor, and ESA Certificate of Acceptance. Toronto Hydro disconnect and reconnect coordinated end-to-end so you get one point of contact for permit, materials, and utility scheduling. A 100A to 200A upgrade in Toronto costs $2,500 to $8,000 CAD depending on whether the service is overhead or underground and which load centre you choose from Siemens, Square D or Eaton, with the ESA permit fee and utility coordination fee itemised on the written quote. Most calls start with a trigger: a Level 2 EV charger install, a cold-climate heat pump, an induction range, a hot tub or sauna, a basement-suite subpanel, a major renovation that puts the panel in front of an ESA inspector, or a 60A fuse panel flagged during a home inspection. We serve Toronto, Etobicoke, Scarborough, North York, York and East York on Toronto Hydro, plus Mississauga, Brampton, Vaughan and Markham on Alectra Utilities, Oakville on Oakville Hydro, Burlington on Burlington Hydro, and Ajax, Pickering, Whitby on Elexicon Energy inside our 50km radius.

View service
Crew removing an Edison-base fuse block and mounting a new breaker panel in a Toronto basement Insurance Deadlines

Fuse Box Replacement

Fuse box replacement in Toronto converts an outdated 60A fuse panel or Edison-base cartridge fuse box to a modern 100A or 200A breaker panel with arc-fault circuit interrupters (AFCI) and ground-fault circuit interrupters (GFCI) where required by the Ontario Electrical Safety Code, plus a whole-home surge protective device (SPD), a copper grounding electrode conductor, an updated neutral bar bonding jumper, and an ESA Certificate of Acceptance your insurer will accept for policy renewal. Toronto Electrical Panel Upgrade handles the Toronto Hydro service disconnect and reconnect, files the ESA permit, and delivers the inspection certificate on the day of energization. A fuse box to breaker panel conversion in Toronto costs $1,800 to $5,000 CAD depending on panel size (24 to 42 circuits), whether the existing service entrance conductors are reusable or need replacement, and which load centre you choose from Siemens, Schneider Electric Homeline, or Eaton BR series. Most calls start with a trigger: a home insurance non-renewal notice, a real-estate closing condition, a home inspection report flagging the fuse box, a Federal Pacific Stab-Lok or Zinsco panel discovered in the basement, or a Notification of Work required for adjacent renovation. We serve Toronto, Etobicoke, Scarborough, North York, York and East York on Toronto Hydro, plus Mississauga, Brampton, Vaughan and Markham on Alectra Utilities, Oakville on Oakville Hydro, Burlington on Burlington Hydro, and Ajax, Pickering, Whitby on Elexicon Energy inside our 50km radius.

View service
Crew removing a Federal Pioneer Stab-Lok panel and fitting a replacement load centre Resale Blocker

Federal Pacific Stab-Lok Panel Replacement

Federal Pacific Stab-Lok panel replacement in Toronto removes a defective Federal Pacific Electric, Federal Pioneer, or Zinsco Stab-Lok panel identified at home inspection or flagged during closing, and installs a code-compliant 100A or 200A breaker panel with proper arc-fault protection, a whole-home surge protective device, an ESA Certificate of Acceptance, and documentation your home insurer will accept to lift a non-renewal notice. The Stab-Lok failure-to-trip defect is a documented resale closing condition across the GTA. Toronto Electrical Panel Upgrade handles the Toronto Hydro service disconnect and reconnect, files the ESA permit, replaces the load centre and any corroded grounding electrode conductor, and delivers the inspection certificate for insurer submission. A Federal Pioneer panel replacement in Toronto costs $2,500 to $6,000 CAD depending on service size (100A vs 200A), whether the meter base and service mast are reusable, and which load centre you choose from Siemens, Square D QO series, Schneider Electric Homeline, or Eaton BR series. Most calls start with a trigger: a home inspection flag identifying breaker colour markings characteristic of Stab-Lok, a real-estate closing condition, a Zinsco or Pushmatic panel discovered during renovation, a home insurance underwriting requirement, or a Notification of Work required for basement finish. We serve Toronto, Etobicoke, Scarborough, North York, York and East York on Toronto Hydro, plus Mississauga, Brampton, Vaughan and Markham on Alectra Utilities, Oakville on Oakville Hydro, and Ajax, Pickering, Whitby on Elexicon Energy inside our 50km radius.

View service

How Your Burlington Panel Upgrade Works

The Burlington Hydro coordination process for Burlington addresses, step by step.

  1. 01

    Service layout approval

    We submit the new service layout, conductor sizing and meter base position so the utility can confirm the point of attachment before any material is ordered.

  2. 02

    Disconnect scheduling

    Once the ESA Notification of Work is filed, we book the disconnect slot. Morning slots let us finish and re-energize inside the same working day.

  3. 03

    Meter pull and service change

    The utility pulls the meter and drops the service. We replace the meter base, service entrance conductors, mast or lateral, and the load centre.

  4. 04

    ESA inspection

    The ESA inspector attends, reviews bonding, grounding, terminations and labelling, and signs off the Certificate of Inspection.

  5. 05

    Energization and handoff

    The utility reconnects and sets the meter. You get the certificate, the panel schedule and the itemised invoice matching the original quote.

Booking a panel upgrade in Burlington?

Burlington Hydro coordination, ESA permit and final inspection are included in the written quote, backed by our Satisfaction Guaranteed promise.

Why Burlington Owners Call Us

  • Burlington Hydro disconnect and reconnect coordinated directly

  • Panel-only specialists, so the service entrance work is routine

  • OESC Section 8 load calculation before any quote

  • ESA permit and final inspection included on every job

Getting to Burlington Panel Jobs

Burlington sits at the western edge of our 50km radius, reached along the QEW and Highway 403 through Aldershot and Roseland. Burlington Hydro is the distribution utility, and we book the disconnect and reconnect through them before confirming the install date.

Burlington Housing Stock We Work On

Aldershot and Roseland carry post-war detached homes on 100A services with original panels and, in places, aluminum branch wiring. Alton Village and the newer north-end subdivisions are 200A builds where subpanels and EV circuits are the usual scope.

Burlington Housing Stock and Seasonal Notes

Burlington sits at the western edge of our service radius, which affects scheduling more than pricing. Aldershot and Roseland carry post-war detached homes on 100A services with original panels and, in the late 1960s stock, aluminum branch wiring that surfaces in autumn insurance reviews. Alton Village and the north-end subdivisions are 200A builds where garage subpanels, workshop circuits and EV charging are the usual scope.

Burlington Hydro handles the disconnect and reconnect. Because we travel further for these jobs, we group Burlington and Oakville work into the same days where possible, which means the assessment is same-week but the install date may sit inside a specific window rather than being fully flexible. We tell you that window up front.

Garage and workshop subpanels are the most common Burlington request, and they have no utility dependency at all, so those jobs typically complete within a week of the quote being accepted.

Neighbourhoods We Cover in Burlington

  • Aldershot
  • Roseland
  • Alton Village
Finished 200A load centre with a labelled breaker schedule in a GTA basement

Local service facts

Distribution utility
Burlington Hydro
Municipality
City of Burlington
Scheduling
Same-Week Scheduling
ESA permit
Included
Book a Free Estimate
View on Google Maps

What Burlington Customers Say

Panel upgrades and service entrance work in this area.

Post-war home on 100A with the original panel. Moved to 200A, new meter base, and the Burlington Hydro reconnect was handled without us chasing anyone.
Dale W.Aldershot
Needed a subpanel in the garage for a workshop and charger. Sized, installed and inspected inside a week.
Monika T.Alton Village

Panel Upgrade FAQs for Burlington

Do you cover Burlington for panel upgrades?

Yes. Burlington sits at the western edge of our 50km GTA service radius, including Aldershot, Roseland, Alton Village and the downtown core.

Which utility handles a Burlington panel upgrade?

Burlington Hydro is the distribution utility for Burlington, and the disconnect and reconnect is booked through them.

Can you add a garage subpanel in Burlington?

Yes. A garage or workshop subpanel runs on a correctly sized feeder with isolated neutral and ground, and covers charger, tool and lighting loads. Subpanel installations run $800 to $3,000 CAD.

What does a panel upgrade cost in Burlington?

A 100A to 200A upgrade runs $2,500 to $8,000 CAD, with the ESA permit fee and utility coordination fee broken out in the written quote.

Does being at the edge of your service area cost more?

No. Travel is not billed as a separate line inside our 50km radius. What it affects is scheduling: we group Burlington and Oakville work into the same days where practical, so the install date sits inside a specific window rather than being fully flexible. We state that window before you accept.

Can you add a workshop subpanel without a service upgrade?

Usually yes. Where the demand calculation shows headroom on your existing service, a garage or workshop subpanel on a correctly sized four-wire feeder covers tool, lighting and charger loads for $800 to $3,000 CAD, with no utility disconnect required.

Still have a question?

Ask the crew directly. We answer load calculation, permit and utility coordination questions before you commit to anything.

Nearby Areas We Also Cover

Crews working near Burlington also handle panel upgrades in these areas.

Same-Week Scheduling

Need an Electrical Panel Upgrade in Burlington?

Same-Week Scheduling for the on-site assessment, with Burlington Hydro disconnect and reconnect coordinated for you.

  • ESA permit and final inspection included
  • Toronto Hydro coordination handled
  • No hidden fees on the written quote

Request a Written Itemised Quote

Four fields. We reply with a free on-site estimate date and the ESA permit and coordination fees broken out separately.

Prefer to talk? Call +1-647-577-6113

Call the Crew Free Estimate